01634 841663 info@groundzero.uk.com

CEB Internal Communications Summit and Awards 2016

This was a two day conference with an awards show on the night of the first day. Ground:zero were required to make the room look different for the awards with just a very short turnaround time, in order to do this, temporary branding panels were replaced in the set in order to change the theme, as well as all of the lighting in the room; this alone completely changed the atmosphere for the delegates when returning to the room for the evening. Everything was then changed back after the awards to accommodate day two of the conference the next day.

Elements:  Custom set design with interchangeable panels for the awards night, reception dressing, full AV support for the duration of the event, live twitter feed screens, Onsite shoot with post event promotional edit

 

Venue: Grange Tower Bridge, London
Audience: 350
Duration: Two days and one evening